Mumbai: The Heavy Civil Infrastructure vertical of Larsen & Toubro has secured an order from Uttar Pradesh Metro Rail Corporation Ltd (UPMRCL) for the design and construction of Agra Metro Phase 1, Line-2. The stretch will run from Agra Cantonment to Kalindi Vihar.
The scope of works involves design and construction of a vital 15.09 km elevated viaduct, 14 stations and 2.61 km depot connecting the metro line from Sadar Bazar to PAC Depot. Architectural finishes for the stations, as well as electrical & mechanical works are also in scope.
The project, which will mark a key milestone in enhancing urban mobility in Agra, is to be completed within a stringent timeline of 30 months.
Commenting on the order win, Mr S V Desai, Whole-time Director & Sr Executive Vice- President (Infrastructure), L&T, said: “L&T remains at the forefront of urban infrastructure development and contributing to the modernisation of India's metro networks in line with its strategic goals. This project will leverage L&T’s extensive expertise in engineering and high-quality execution’.